Mexico’s newest oil refinery to begin crude processing in July …

    Mexico’s newest oil refinery to begin crude processing in July …

    MEXICO CITY, Jan 24 (Reuters) – Mexican state oil company Pemex’s newest refinery, which is still under construction in Mexico’s southeast, will begin to process crude oil in July 2023, the country’s Energy Minister Rocio Nahle said.

    Things are “going really well,” Nahle told reporters late on Monday after a meeting with the president, noting the refinery would begin processing in July, a year after its official inauguration.

    The Olmeca refinery, the cornerstone of President Andres Manuel Lopez Obrador’s plan to make the country self-sufficient in gasoline and diesel, was originally slated to come on line early last year.

    Meanwhile, the budget for the construction and other infrastructure needed to connect the refinery has more than doubled from an initial $8 billion.

    In December, Lopez Obrador said that on July 1, the refinery “will begin to process 170,000 barrels per day (bpd) of crude oil.”

    The government has said that the refinery, Pemex’s eighth, would eventually have capacity to process 340,000 barrels per day.

    Located in Lopez Obrador’s home state of Tabasco, the refinery is one of the leftist president’s signature public works projects.

    But it has faced criticism from opponents as well as energy and environmental experts over costs and timing – especially as rivals around the world are stepping up a transition away from fossil fuels towards renewable sources of energy.

    Pemex is seeking to increase its current crude production of around 1.7 million bpd by increasing its local refining.

    After launching a rehabilitation program for its six refineries already operating domestically, under Lopez Obrador, Pemex also acquired Shell’s 50.005% stake in a plant in Deer Park refinery in Houston, Texas.

    Reporting by Ana Isabel Martinez
    Editing by Bernadette Baum

    Our Standards: The Thomson Reuters Trust Principles.

    Read More

    Leave a Reply

    Your email address will not be published. Required fields are marked *

    3

    Private rental market faces £19bn EPC-upgrade bill

    Private rental market faces £19bn EPC-upgrade bill

    News The cost of getting private rental housing in England up to tougher EPC guidelines by 2025 is set to be around £19bn, new research by Hamptons on behalf of Bloomberg has revealed. The study, which analysed data from the Department for Levelling Up, Housing and Communities, found that almost half of privately rented homes […]

    Read More
    Latent defects and appropriate remedial solutions

    Latent defects and appropriate remedial solutions

    News David Weare is a partner and Ian Smith is a senior associate at Fladgate LLP The recent decision in St James’s Oncology SPC Ltd v Lendlease Construction provides helpful guidance to PFI-project companies, design and build contractors, and employers generally when dealing with latent-defect claims. The case concerned a new oncology centre at Leeds […]

    Read More
    HS2 investigates slurry pool above Costain-Skanska tunnelling

    HS2 investigates slurry pool above Costain-Skanska tunnelling

    News An HS2 tunnel boring machine HS2 is investigating how a roughly 6 square metre pool of bubbling slurry emerged on a rugby pitch in Ruislip, north-west London. The brown foam emerged from the ground on Saturday (18 February), above a site where CSC – a joint venture between Costain, Skanska and Strabag – is […]

    Read More